First-road-trip "route-dye" map×festival-wristband collage: Hippie bags hallucinate nostalgia and nomadic freedom.
First-road-trip "route-dye" map×festival-wristband collage: Hippie bags hallucinate nostalgia and nomadic freedom. First-road-trip "route-dye" map×festival-wristband collage: Hippie bags hallucinate nostalgia and nomadic freedom.
Home Luxurious Fashion Bags Emerald-Trimmed Leather Bags
Mona flying Casual Wing Tip Oxfords Brogue for Women Ladies Handmade Lace up Leather Derby Shoes

Mona flying Casual Wing Tip Oxfords Brogue for Women Ladies Handmade Lace up Leather Derby Shoes

$ 69.61

$ 90.49

Save: $

Color:
  • Black
  • Black/Green
  • Blue
  • Brown
  • Dark Blue-green
  • Grey
  • Jujube Red
  • Black-recocoo Red
  • Brown-grey
Size:
  • 7.5
  • 6.5
  • 10.5
  • 10
  • 8.5
  • 8
  • 9
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details



    • Vamp: Luxurious Sheepskin Upper
    • Lining: Soft Breathable Leather
    • Leather-covered Insole: Non-removable, Supportive and Comfy
    • 2.5cm(0.98 In) Heel: Practical for Work-to-weekend Wear
    • Classic Handcrafted Oxford Trimmed with Chic Brogue Perforations, Effortlessly Fit Your Work-to-weekend Outfits


    No road is long with good company, No road is long with good shoes.
    Mona Flying shoes are such good company, supporting you every step of the way, offering the best possible wearing experience.

    Lace Up Oxfords Highlights:
    ★Premium leather uppers boasts a exclusive feel and a chic look
    ★Leather lining and leather-covered inlay sole for great comfort and support, also keep footwear fresh and dry
    ★Rubber outsole provides an elegant look with highly durable performance
    ★2.5cm(0.98 in) heel make it Light, flexible and easy to walk, perfect for work-to-weekend wear
    ★Handmade Leather Oxfords keeps the styling firmly on-trend

    Attention
    1.Make sure you have carefully checked size chart before you purchase:
    ·If you have narrow feet, buy the normal size you wear.
    ·If you have wide feet, buy half size or one size bigger than your normal size.
    2.Color variation:
    ·Due to shooting light, shooting angle and monitor displays, the pictures and the items may be slightly off color.
    ·Since the shoes are purely handmade, there might be minor flaws which can't be ruled out, but won't affect its beauty and comfort.
    3.Do not wear white/ light-colored socks since the real leather lining can discolour somewhat and which can not be ruled out.

    Package
    Each shoe will be wrapped up separately by bag in one box.



    • Department ‏ : ‎ womens
    • Date First Available ‏ : ‎ January 11, 2018

    You May Also Like

    Men's Cooling Ice Silk Running Shirts Quick Dry Short Sleeve Athletic Gym T-Shirts UPF 50  Outdoor Workout Tshirts
    Men's Cooling Ice Silk Running Shirts Quick Dry Short Sleeve Athletic Gym T-Shirts UPF 50 Outdoor Workout Tshirts

    $ 17.00

    Save: $

    Tie-Dye Canvas Crossbody Bag
    Tie-Dye Canvas Crossbody Bag

    $ 13.82

    Save: $

    Weaver Leather Diamond Braid Rope Halter and Lead
    Weaver Leather Diamond Braid Rope Halter and Lead

    $ 20.00

    Save: $

    Ausrüstungstasche Gear Bag 40
    Ausrüstungstasche Gear Bag 40

    $ 85.00

    Save: $

    First Lite Men’s Wick Hoody - Merino Wool Ultralight Camo Hunting Base Layer, Quick Dry, UV Protection Hunting Clothing
    First Lite Men’s Wick Hoody - Merino Wool Ultralight Camo Hunting Base Layer, Quick Dry, UV Protection Hunting Clothing

    $ 99.00

    $ 120.00

    Save: $

    Reli. SuperValue 65 Gallon Trash Bags | 120 Count | Made in USA | Heavy Duty | Bulk | Black Multi-Use Garbage Bags
    Reli. SuperValue 65 Gallon Trash Bags | 120 Count | Made in USA | Heavy Duty | Bulk | Black Multi-Use Garbage Bags

    $ 40.00

    $ 57.00

    Save: $

    ERYE 3-Seaters Living Room Clasic Chesterfield Sofa Couch Button Tufted PU Leather Upholstered Sofa&Couch with Luxury Roller Armrest Soild Wood Legs Movable Cushions & Nailhead Decor
    ERYE 3-Seaters Living Room Clasic Chesterfield Sofa Couch Button Tufted PU Leather Upholstered Sofa&Couch with Luxury Roller Armrest Soild Wood Legs Movable Cushions & Nailhead Decor

    $ 99.00

    $ 608.00

    Save: $

    Sperry Mens Shoes Men's Striper II Lace to Toe Seasonal Sneaker, Taupe Linen, 4.5
    Sperry Mens Shoes Men's Striper II Lace to Toe Seasonal Sneaker, Taupe Linen, 4.5

    $ 25.00

    $ 36.00

    Save: $

    WZMPA Ice Skating Cosmetic Make Up Bag Figure Skating Inspired Gift Peace Love Skating Makeup Zipper Pouch Bag Skating Ice Merchandise (Peace Skating)
    WZMPA Ice Skating Cosmetic Make Up Bag Figure Skating Inspired Gift Peace Love Skating Makeup Zipper Pouch Bag Skating Ice Merchandise (Peace Skating)

    $ 15.00

    Save: $

    Ukraine Flag Rainbow | Cyrillic Slava Ukraini Tote Bag
    Ukraine Flag Rainbow | Cyrillic Slava Ukraini Tote Bag

    $ 15.00

    $ 19.00

    Save: $

    Cart
    First-road-trip "route-dye" map×festival-wristband collage: Hippie bags hallucinate nostalgia and nomadic freedom.
    Your cart is currently empty.